SOLAR POWER IN MICHIGAN

Sylvan Solar

in development

AES’ Sylvan Solar project is a proposed solar facility in Newaygo County, Michigan. This project will be crucial in supporting Michigan’s ambitious energy goals to produce 60% of the state’s power from clean energy by 2030 and be carbon-neutral by 2050.

 

Solar panels in a grassy field with trees in the background on a sunny day.
A gray lightning bolt inside a circular gradient ring transitioning from purple to green.
220 MW capacity
Illustration of a gray house with a blue and green line underneath, symbolizing energy flow.
Enough clean energy to power the equivalent of 55,000 homes 
Gray location pin icon with a colored circular base in blue and green gradient.
Located in Newaygo County, Michigan

Our clean energy commitment

AES’ Sylvan Solar is a proposed facility in Michigan. We are committed to responsible clean energy development that creates long-term value and positive impact for both the environment and local communities.

Solar panels in a field of wildflowers under a cloudy sky.

Economic and environmental benefits

We believe in being a good neighbor, ensuring responsible clean energy development that benefits both the environment and local communities without burdening existing infrastructure.

~$293M

In expected net economic gains for southern Newaygo County over the life of the project

~1,085

Annual jobs supported during construction 

Image
Sylvan Solar Map
  • Sited on approximately 1,250 acres of land
  • At the end of the project's life, a decommissioning plan allows for the land to return to agricultural use or other uses consistent with land-use policies at the time 

 

Disclaimer: The document provided on this webpage is a copy of the Conditional Use Permit (CUP) Application submitted for Garfield Township on August 19, 2025 and the Special Land Use Permit Application submitted for the Fremont Community Joint Planning Commission submitted on September 15, 2025 in connection with the proposed Sylvan Solar Project. This copy is made available for informational purposes only. Please note that the specific details of the project as described in the Application are subject to change. Updates, revisions, or supplemental materials may be submitted as part of the permitting process, and the final approved permit may contain conditions not included in the Application.

How clean energy benefits

local communities 

Gray heart with a colorful gradient ring encircling it.

Long-term tax revenue to the surrounding community

Icon of a document with lines representing text and a dollar sign in a circle at the top right corner.

Local economic stimulation through job creation and tax revenue

Gray spherical robot with a colorful horizontal stripe across the middle.

Job creation during construction and operation

Gray plant icon with two leaves outlined in gradient colors.

Landowner income diversification, keeping land in the family

Gray icon of three people inside a circle with a gradient border from blue to green.

Social impact funding to area community organizations and non-profits

Aerial view of a large solar farm with multiple rows of solar panels on green fields, surrounded by trees.

Sustainability Resources

Sustainability best practices

At AES, safety is our highest priority, and we’ve focused on improving lives for more than 40 years. As a leading innovator in energy solutions, sustainability is core to both our strategy and our culture. We are committed to responsible land use and incorporating sustainable best practices into the entire project lifecycle, contributing to building a domestic circular renewables economy and reducing foreign dependence.

Environmental and technical studies

We conduct a series of studies that ensure our projects are thoughtfully and responsibly designed, including but not limited to:
 

  • Wetland and Waterbody Study
  • Threatened and Endangered Species Study
  • Economic Impact Analysis
  • Noise Study
  • Traffic Study
Local partnerships

At AES, we understand that our success as a company is only as strong as our partnerships with the communities where we operate. That’s why we partner with communities, customers, state agencies, higher education, elected officials, and other key stakeholders to see how we can best work together to support sustainable social and economic development.

  • The River Country Chamber of Commerce of Newaygo County
  • Michigan Chamber of Commerce

Contact us

We appreciate your interest in AES’ Sylvan Solar project. Please contact us using the information below.